Built in 2010, the Grade-A office comprises 117,679 sq ft over 10 storeys, and is let to tenants including Sky UK, Global Radio, Irwin Mitchell and DAC Beachcroft.
Developed by Moonglade Holdings with floor plates from 11,000 to 14,000 sq ft, Wellbar was designed by Middlesbrough-based Lister Associates, replacing the 14-storey Wellbar House which used to stand on the site.
The complex was the only Grade A development to be completed in 2010, building on the success of neighbouring Time Central which was the first development in the emerging business district.
Stonescreen provided their curtain wall system faced with Fletcher Bank English sandstone.
Stage: completed.

Stonescreen curtain wall system faced with Fletcher Bank English sandstone.